Archives

Tag Archive for: ‘dredge finished’
Marina Dredge Finished

Our much needed dredge of the berths on pontoons D through to the G linear  has now been completed. A survey of the bottom indicates an average depth now of 2.8 to 3.0 meters. At the end of the campaign some 4500 cubic meters of material had been removed and placed on the foreshore as …

Read more »